国产热RE99久久6国产精品首页,四川少妇搡BBW搡BBBB,日韩 另类 综合 自拍 亚洲,4hu44四虎www在线影院麻豆

Service hotline:
0315-5913666(domestic)+1-304-960-1190(abroad)
Domestic > The relocation project of the 3 million ton/year coal preparation plant of Etuoke Banner Xinya Coal and Coke Co., Ltd
1(1).jpg
  • 1(1).jpg

The relocation project of the 3 million ton/year coal preparation plant of Etuoke Banner Xinya Coal and Coke Co., Ltd

Type: Coking coal preparation plant

Scale: 3.0Mt/a

Contracting mode: partial contracting, new construction projects

Process: The 50-0mm raw coal is fed into a three product heavy medium cyclone without desliming, classification, and pressure. Coarse coal slurry is sorted by the coal slurry heavy medium cyclone, fine coal slurry is sorted by a flotation machine, and flotation clean coal is dehydrated and recovered by a horizontal settling filtration centrifugal dewatering machine and a filter press. The flotation tail coal is collected using a two-stage concentration process. After the tail coal slurry water is concentrated in the thickener, it is dehydrated and recovered by a horizontal settling filtration centrifugal dewatering machine and a filter press. The washing water is closed loop, environmentally friendly and energy-saving.

亚洲欧洲AV一区二区久久| 顶级欧美熟妇高潮XXXXX| 国产精品爆乳奶水无码视频| 精品无码国产自产拍在线观看| 日韩AV影院在线观看| 亚洲第一成人网站|